KYUSYU SENKOLOGI Co.,Ltd. Tosu Logistics Center






Use application | Distribution center |
---|---|
Construction site | Tosu, Saga |
Opened on | February, 2025 |
Structure / Scale | S / 3 floors above ground |
Total floor space | 45,602.60㎡ |
Tags |
|
Use application | Distribution center |
---|---|
Construction site | Tosu, Saga |
Opened on | February, 2025 |
Structure / Scale | S / 3 floors above ground |
Total floor space | 45,602.60㎡ |
Tags |
|